Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | path, sign |
Date time: | 8.49am, Saturday 10th April, 2010 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
New Shared Pathway sign at beginning of Alyssum Walk, off St. Andrews Avenue.
Notice the patches of tar where railings and bollards once stood (see #20786). It's just a shame the drop kerb hasn't been extended to the full width of the pathway now they're gone.
Comments reflect the views of the original submitter only.