Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | construction, crossing |
Date time: | 2.33pm, Saturday 16th October, 2010 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
Progress at the new Layer Road toucan crossing, connecting the Boadicea Way cycle path and Garrison route.
Comments reflect the views of the original submitter only.