Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cycle, lane |
Date time: | 1.05pm, Sunday 21st November, 2010 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
The new path connecting Ypres Road to the Garrison network is open but awaiting the top layer. Not clear yet what is happening to the other path.
Comments reflect the views of the original submitter only.