Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cycle, lane |
Date time: | 1.57pm, Thursday 5th May, 2011 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
A new path underconstruction on Berechurch Rd alongside two pre-existing ones.
Comments reflect the views of the original submitter only.