Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, elephant, feet, wbm294 |
Date time: | 9.18am, Thursday 1st March, 2012 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
"Elephant feet" crossing where Shrub End Sports Ground dissects the Boadicea Way shared-use path.
Comments reflect the views of the original submitter only.