Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cycleway, pathway, resurfaced |
Date time: | 6.08pm, Thursday 17th September, 2015 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | mitcml |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Colchester |
Some of the shared use pathway through High Woods Country Park has been resurfaced (see #65169 prior to resurfacing). Unclear if it's going to remain as it is or have a gravel coating applied to be in keeping with original path, or when the remainder of the path will be resurfaced.
Comments reflect the views of the original submitter only.