You may also be interested in the automatic categorisation listings and themed galleries.
This listing only shows photos within Colchester.
Go to the national CycleStreets photo listings for photos beyond.
Construction of new cycleway connecting the Garrison route to Ypres Road and further along, Circular Road South.
The long-awaited toucan crossing of Layer Road, linking the Boadicea Way cycle lane and Garrison route is taking shape.
Progress at the new Layer Road toucan crossing, connecting the Boadicea Way cycle path and Garrison route.
Construction of the long-awaited crossing of Layer Road, connecting the Boadicea Way cycle path and the Garrison Route has begun. As part of the works the bus stop is being relocated.
Work has begun on the long-awaited crossing of Layer Road, connecting the cycle path along Boadicea Way and the Garrison Route.
While new cycle ways are under construction (see #25372 and #25373) cyclists have to work out their own diversion route.
While work is carried out creating new cycle ways (see #25372 and #25373) at the end of Ypres Road, it is blocked off. However the other side of the works cycle network exists and there should be a diversion in place for cyclists to get to … [more]